What to Expect on Test Day

If you have never scheduled a load bank test, it helps to know what your technician will do and what you need to prepare. While every site is different, most tests follow the same basic steps.

Before the Test

  • Scheduling: the test is planned around your operations, with notice to building staff and anyone affected.
  • Site review: the technician confirms access, where the load bank will sit and how it will connect.
  • Fuel check: there needs to be enough fuel on hand for the full test and a safe reserve afterward.

The Step-by-Step Procedure

  1. Pre-test inspection. The technician checks fluid levels, belts, hoses, battery, fuel system and visible condition before starting.
  2. Connect the load bank. The portable load bank is positioned and connected to the generator output following safety procedures.
  3. Start and warm up. The generator is started and allowed to reach normal operating temperature.
  4. Apply load in steps. Load is increased in stages, often in increments up to the target level, with readings recorded at each step.
  5. Hold at load. The generator runs at the target load for the planned test duration while the technician monitors voltage, frequency, amperage, temperatures and pressures.
  6. Step down and cool down. Load is reduced in stages and the engine is allowed to cool before shutdown.
  7. Post-test inspection. The technician checks for leaks, unusual wear or other findings and disconnects the equipment.
  8. Report. You receive a report with the readings, findings and recommendations.

Will My Building Lose Power?

In most cases a load bank test uses the portable load bank instead of your building load, so normal operations continue. Your technician will explain the plan for your site in advance, including any switching that is needed.

How Long Does It Take?

Test length depends on your plan and requirements. Common tests run 2 hours or 4 hours at load, plus time for setup, warm-up, cool-down and inspection.

How Managed Generator Services Can Help

Managed Generator Services has more than 25 years of experience and factory-trained, certified technicians serving 12 states from New Jersey to Florida. Our team is on call 24/7 with typical response times of 2 to 4 hours, and we service all major makes, models and sizes. Learn more about our load bank testing service, or ask us to schedule a test as part of your commercial preventative maintenance plan.

Contact our team to request service or build a plan for your site.

Cover image for: Load Bank Testing: Step-by-Step Procedure Your Technician Follows
Here is what your technician does during a generator load bank test, step by step, and how to prepare for test day.
November 23, 2026
Recent Blog Posts:
Cover image for: 5 Signs Your Emergency Generator Is Failing Its Load Bank Test
5 Signs Your Emergency Generator Is Failing Its Load Bank Test
Five warning signs your emergency generator is failing a load bank test, from unsteady voltage to overheating and shutdowns, and what to do next.
READ THE FULL POST
November 23, 2026
Cover image for: Understanding Test Results: How to Read Your Load Bank Report
Understanding Test Results: How to Read Your Load Bank Report
A plain-language guide to your generator load bank report: equipment details, load steps, voltage, frequency, temperatures and what the findings mean.
READ THE FULL POST
November 23, 2026
Cover image for: What Is a Load Bank Test and Why Your Generator Needs One
What Is a Load Bank Test and Why Your Generator Needs One
What a generator load bank test is, how it works, and why it matters: proving capacity, finding hidden problems, reducing wet stacking and supporting compliance.
READ THE FULL POST
November 23, 2026